Days 1 and 2 groundworks at TinyTots Nursery
Published May 28, 2011 by James Gardner
Day One of the Build....
Work has now started on the TinyTots site at Trethorne Leisure farm near Launceston. The fence posts are going in and you can see the top soil being scraped back ready to be used later in the build. We will post a regular update on the progress of this project along with other work that we are doing over the next few weeks.

Day 2 - After a morning of rain, work started again on the top soil removal. The large stones were carefully placed into their final resting positions ready for the play deck to be built around them. The paths and play spaces are now marked out, ready for some serious reconstruction. The landscape has been designed so that the whole garden can be seen through to the rear - nearly 35 meters away.

Categories
- All Blog Categories (22)
- Play Areas (2)
- Products (2)
- Projects (2)
- Wild Flowers (1)
Recent Posts
- Tree planting scheme
- Days 1 and 2 groundworks at TinyTots Nursery
- Jobs to do in May
- Concrete Canvas
- Natural Planting
- Mussel shell use
- Bringing our work to Devon
- Planning day for children
- Plant-a-box web site
- Create a Summer border
Archives
- July 2011 (1)
- May 2011 (4)
- April 2011 (7)
- March 2011 (1)
- February 2011 (3)
- November 2010 (1)
- August 2010 (5)